Product Details
Place of Origin: China
Brand Name: Qingdao Zaili Electric Power Equipment Co., Ltd.
Certification: CE,ISO
Model Number: Steel Structure Building
Payment & Shipping Terms
Minimum Order Quantity: 1ton
Price: Need to inquiry
Packaging Details: Wooden case,Wooden crate,Bundle
Delivery Time: As agreed upon
Payment Terms: TT or L/C
Supply Ability: 100,000 tons per year
|
Product Name:
|
Steel Structure Building
|
Material:
|
A36 / S235JR/ CT3nC、A 572 Gr.50 / S355JR/ 09[ 2C、 A572 Gr.65 / S420N/ 15F2CΦ Or According To The Standards Provided By The Customer
|
Payment Terms:
|
TT Or L/C
|
Delivery Time:
|
As Agreed Upon
|
Galvanization Standard:
|
EN ISO 1461,ASTM/A123 Or Equivalent
|
Lifetime:
|
50 Years
|
Trade Terms:
|
EXW,FOB,FCA,CFR,CIF,DAP Etc
|
|
Product Name:
|
Steel Structure Building
|
|
Material:
|
A36 / S235JR/ CT3nC、A 572 Gr.50 / S355JR/ 09[ 2C、 A572 Gr.65 / S420N/ 15F2CΦ Or According To The Standards Provided By The Customer
|
|
Payment Terms:
|
TT Or L/C
|
|
Delivery Time:
|
As Agreed Upon
|
|
Galvanization Standard:
|
EN ISO 1461,ASTM/A123 Or Equivalent
|
|
Lifetime:
|
50 Years
|
|
Trade Terms:
|
EXW,FOB,FCA,CFR,CIF,DAP Etc
|
Large Span Steel Structure Warehouse for Fast Construction and High Load-Bearing Industrial Needs
With its core advantages such as large span, fast construction, high cost-effectiveness, and environmental recyclability, steel structure warehouses have become the mainstream choice for industrial warehousing, logistics transfer, and special storage scenarios, especially suitable for large-scale, high-load, and fast-turnover warehousing needs.
The durability of Steel Structure Warehouses make them one of the most popular choices for modern industrial and commercial buildings. No matter what your needs are, we can provide a design solution that suits you.
Steel structures are rigorously designed and precision manufactured to become the most durable building material in warehouse buildings. Steel prefabricated warehouses are also one of the most economical and reasonable building options available today. After the prefabricated parts are manufactured, we simply need to install them into the designated locations. The manufacturing process of these prefabricated parts is very strict, and they will only be released by the factory after passing strict quality inspection and control.
Our company has a professional team in design and manufacturing. They specialize in undertaking various industrial and commercial needs and will customize steel structure warehouse building plans and develop personalized designs based on individual needs. Steel warehouses can be of any shape and size, giving our customers more flexibility in building their commercial and industrial needs.
It is mainly divided into three categories: welded connections, bolted connections, and riveted connections.
| No. | Comparison Dimensions | Steel Structure Warehouse | Concrete Warehouse |
|---|---|---|---|
| 1 | Space utilization rate | High (large span, high clearance) | Low (span ≤ 15m, clearance ≤ 6m) |
| 2 | Construction period | Short (1/3-1/2) | Long (3-6 months) |
| 3 | Load-bearing capacity | High (suitable for heavy cargo and overhead vehicles) | Low (stack load ≤ 3t/㎡) |
| 4 | Flexibility | Disassembled and expandable | Non-disassembled and non-adjustable |
| 5 | Environmental friendliness | Recyclable, low emissions; | high construction waste, high carbon emissions |
| 6 | Long-term costs | Low (low maintenance costs, long lifespan) | High (frequent repairs, slow depreciation) |